Programmable Transformer Rectifier for Railway Inverter Testing

A cascaded transformer-rectifier system providing programmable 900–1800 VDC and 230 kW continuous power for railway inverter testing, with integrated real-time control and SCADA.

Installed NSAD transformer rectifier cabinets and the adjacent operator panel.
Delivery year
2025
Application
Post-assembly functional verification and selected type and routine testing of railway auxiliary inverters at production testing facilities.
  • Railway Testing
  • Transformer Rectifier
  • Power Electronics
  • Traction Power Simulation
  • SCADA
  • Data Logging

In 2025, NSAD designed and delivered a programmable transformer-rectifier system for post-assembly functional verification and selected type and routine testing of railway auxiliary inverters. The 300 kVA system provides a programmable 900–1800 VDC main output, with 230 kW continuous output power, while 250 kW peak DC output was separately recorded during type testing.

A cascaded transformer-rectifier architecture enables programmable DC power-output simulation of representative railway traction supply conditions, including operation around a nominal 1,500 VDC system. Controlled power-interruption and restoration simulation allows converter behavior to be evaluated under defined input-supply scenarios, supporting repeatable production testing.

Alongside the main high-voltage output, a regulated 77–132 VDC, 2.2 kW auxiliary supply supports simulation of onboard battery-supply conditions. This enables auxiliary power requirements to be addressed within the same inverter testing setup.

The system uses NSAD’s MRCU-3U embedded controller platform for real-time control, 10 kHz monitoring and protection, and integrated electrical protection and safety interlocking. SCADA provides supervisory monitoring, operator control, and test-status visualization, while time-critical monitoring and protection are handled by the embedded controller.

RS-485 and CANopen interfaces enable remote monitoring and integration with external testing equipment, complemented by remote data logging. Relevant testing activities reference IEC/EN 61287-1, JIS E 5008, and EN 50163. Together, these capabilities provide a controlled, monitored, and protected power source for railway converter verification.

Technical Highlights

Input system rating
300 kVA
Programmable main DC output
900–1800 VDC
Continuous output power
230 kW
Peak DC output recorded during type testing
250 kW
Regulated battery-simulation supply
77–132 VDC
Auxiliary output power
2.2 kW
Power simulation architecture
Cascaded transformer-rectifier
Real-time monitoring and protection rate
10 kHz
SCADA controller platform
NSAD MRCU-3U
Remote monitoring interfaces
RS-485 / CANopen

Related Solutions